CNRS Université Paris-Sud 11



Rechercher

Sur ce site

Sur le Web du CNRS

CSNSM - UMR8609
Bâtiments 104 et 108
91405 Orsay Campus

+33 1 69 15 52 13
104 +33 1 69 15 50 08
108 +33 1 69 15 52 68
Mentions légales

Accueil > Groupes de recherche > Structure du noyau > AGATA > Database Team > Simulated Data

Simulated Data


Initially the calculations were performed by A. Olariu using MGS-v5 on a 2 and 5 mm grid.

Later calculations were performed using MGS-v5-r2 on a 1 mm grid for a symmetric detector with an anisotropy of 40 degrees.

Gzipped tars of these raw data data are available by following the red tabs. These data have also been pre-processed and sorted in ROOT trees of the same format as the scan data.

GIF - 11.6 kb
core_z86_x85.5.gif

Charge collection at the electrodes is performed at (nominally) 1 ns intervals. However, if full charge collection of either the electrons or the holes occurs at a sub-ns interval then these data points are also added as incated in the plot of charge vs time.